On-site installation
On-site installation

Our company has participated in more than 160 steel structure projects, with a total of 1.5 million tons of steel structure engineering and 1 million tons of installed steel structure engineering. We have accumulated extensive construction experience and mastered internationally advanced steel structure hoisting technologies. The company has repeatedly implemented advanced construction and hoisting technologies, including super-heavy weight computer-controlled hydraulic synchronous lifting, super-high sliding tire frame technology, super-large complex space steel structure double-machine lifting technology, two-way tension truss construction and installation, flexible track separation push sliding construction, irregular spherical steel structure installation, special-shaped inclined structure installation precision control, large-span super-high inclined giant arch two-point cumulative lifting, and more. These efforts have earned numerous national, provincial, and ministerial awards for excellence, as well as many invention patents and methods.

Arch rib closure of the steel tube arch bridge of the Fengzhen Super-Large Bridge on the Ji-Da Railway
Astana Light Rail Phase I Arch Bridge Across the Ishim River Completed
Steel Box Girder Hoisting for the Intersection Project of Fangtang Expressway and Cross-Lannan Expressway
Pandian Interchange Steel Box Girder Project on the Lanyuan Expressway, Fengqiu to Yuanyang Section
Steel Structure Project for the Beijing Winter Olympic Games Office Building
Steel Structure Intercooling Tower Project for the New Guodian Shuangwei Power Plant Construction