HR
Language Switching:
On-site installation
On-site installation

Our company has participated in more than 160 steel structure projects, with a total of 1.5 million tons of steel structure engineering and 1 million tons of installed steel structure engineering. We have accumulated extensive construction experience and mastered internationally advanced steel structure hoisting technologies. The company has repeatedly implemented advanced construction and hoisting technologies, including super-heavy weight computer-controlled hydraulic synchronous lifting, super-high sliding tire frame technology, super-large complex space steel structure double-machine lifting technology, two-way tension truss construction and installation, flexible track separation push sliding construction, irregular spherical steel structure installation, special-shaped inclined structure installation precision control, large-span super-high inclined giant arch two-point cumulative lifting, and more. These efforts have earned numerous national, provincial, and ministerial awards for excellence, as well as many invention patents and methods.

Construction site of Zhengzhou South Railway Station
Xinxiang Jingu All-Steel Structure Prefabricated Housing Project
New Zhengzhou-Jinan Railway Zhengzhou-Puyang Section Project
World Kung Fu Center Project
Anyang Gaoling Mausoleum Protection and Exhibition Project
Shouzhuo Yuan, Xinxiang