Our company has participated in more than 160 steel structure projects, with a total of 1.5 million tons of steel structure engineering and 1 million tons of installed steel structure engineering. We have accumulated extensive construction experience and mastered internationally advanced steel structure hoisting technologies. The company has repeatedly implemented advanced construction and hoisting technologies, including super-heavy weight computer-controlled hydraulic synchronous lifting, super-high sliding tire frame technology, super-large complex space steel structure double-machine lifting technology, two-way tension truss construction and installation, flexible track separation push sliding construction, irregular spherical steel structure installation, special-shaped inclined structure installation precision control, large-span super-high inclined giant arch two-point cumulative lifting, and more. These efforts have earned numerous national, provincial, and ministerial awards for excellence, as well as many invention patents and methods.
-
The main steel structure of the second bid section of Yiwei Malaysia's first-phase project construction has been capped
-
Lifting of the first steel box girder at the Shixiang Interchange of the XCTJ-1 section of the Xuchang Ring Road
-
First hoisting of the steel box girder across Shouqu Avenue at the Xiying Interchange on the main line of the Nandeng Expressway
-
Pushing and hoisting of the steel box girder for the three-standard Fuji hub interchange on the Lankao-Taikang section of the Lankao-Shenqiu Expressway
-
Pushing construction of the steel truss beam for the Dongliang Expressway Bridge project
-
The first section of the steel box girder for the Xinxiang section of the Jiaoping Expressway, crossing the Yudeng Railway, was hoisted